Second Floor Construction           
Page:  1   2   3   4   5   6  

Phase Four

The railing has been completed, the stucco work is almost done, the electrical rough is almost complete, and the windows are being installed. Next the tile work can begin - including the trim on the front edge of the roof, (similar to the trim on the first floor), the floor and stairs, and then the bathroom walls and shower.